RESTORING ARCHITECTURE. ENSURING LONGEVITY
This multi-phase project consisted of stripping existing stucco and sheathing off of each building, replacing damaged wood framing, installing new sheathing, re-setting the existing windows, applying a new stucco system, waterproofing balconies and replacing railings. This was followed by coating the entire building with a commercial grade acrylic paint system.